India Water Systems Atlas · Build 35

National evidence & readiness

Source-checked national water estimates and historical vintages

A source-linked index of preserved evidence, source-reported geography and analyses that remain unsupported. Source-row counts are not unique observations, verified indicators or map features.

Geography note. North, South, East and West are Atlas browsing groups, not basin boundaries. Basin labels below are exact source strings shown separately per payload. They are not normalized or joined to states, regions, rivers, assets or infrastructure.
Loading…
Water Security framework → nine modules, eight assessment dimensions and Outlook

Verified source snapshots

India water-system indicators

Separate indicators with their source periods and meanings. These figures do not add up to a national water balance.

Loading preserved national indicator records…

Interactive route map

Explore India by Atlas region and state

The map reuses the existing four-region administrative browsing geometry. It is not a basin map. State and GIS route cards show actual v5 page coverage.

Open national waterbody GIS index →
India Water Systems — four regions NORTH Boundaries: Survey of India, via DataMeet (CC BY-SA)
Choose a colored region on the map. The map links to the corresponding regional Atlas page.

Loading route coverage…

Waterbody GIS routes without a state narrative entry

GIS availability is not complete state data coverage.

North administrative groupSouth administrative groupEast administrative groupWest administrative groupState route availability does not imply complete evidence.

Regional browsing groups

These routes organize existing state pages; no hydrological membership or transfer is inferred.

Water security evidence and gaps

Water security evidence pathways

Source-backed signals available in this Atlas today. These are separate measurements and reporting frames, not a composite water-security score. Open each source-period view before comparing places.

Groundwater resources

CGWB resource assessments by published assessment year, method and source geography. Assessment estimates are not direct storage measurements.

Open groundwater resource comparison →
Urban service levels

Comparable district-level quantity, continuity and LPCD evidence is not established in this national view.

Coverage gap · no score assigned

The nine master narratives are integrated below beside related evidence. The Water Security framework contains the eight assessment dimensions and three Outlook scenarios; these organize evidence and gaps, not a composite score or forecast.

GIS evidence coverage

Groundwater and infrastructure GIS evidence

Mapped source layers are kept separate from measured water levels, live storage and service performance.

First-aquifer raster source previews

New HR, PB and WB raster previews use source TIFF georeferencing. Raster-value units are undocumented, so these are contextual source surfaces only. The existing TN preview remains unchanged.

Haryana · Punjab · West Bengal · Tamil Nadu
Barrage, weir and anicut inventory

1,101 points pass the explicit coordinate-field check; one location is held. Source publisher and retrieval date remain unverified; inventory presence does not imply current operation or measured flow.

Open point map and filters →
Groundwater resource series

Historical state attributes are already preserved with their source assessment year and geography. Geometry was not used for a new map because axis/extent QA is unresolved.

Comparable 2025 assessment view

Recharge planning, rainfall grids and agro-ecological polygons are not displayed as current water outcomes: the downloadable recharge-layer publisher/date is absent from the retained inventory and the polygon axes/geometries remain unresolved; rainfall grids contain no rainfall measurements; agro-ecological geometry axis/order is not established. See the v5 GIS disposition register.

India Water Systems · Editorial master narrative

Population, urbanisation, industry and emerging demand

Read the analysis

Population growth changes the number and location of water users; urbanisation changes the concentration and timing of demand. Construction, industrial clusters, power generation, tourism and data centres can create local peaks that national averages conceal. Rural demand also changes as households gain piped connections and service expectations increase.

A household tap connection is an infrastructure-access measure, not proof of water quality, hours of supply, litres per capita per day or continuity. Maharashtra JJM evidence in the Atlas should therefore remain clearly separated from measured service performance. Urban planning should connect population forecasts, land-use expansion, commercial and industrial demand, non-revenue water, source reliability and wastewater return flows.

Decision test: where will incremental demand occur over the next five years, and what verified source or demand-reduction measure can serve it? Outcome indicators: population served, measured supply, service hours, quality compliance, industrial abstraction, distribution losses and forecast uncertainty.

India Water Systems · Editorial master narrative

Water economics, incentives and investment

Read the analysis

Water investments must be judged by the service and resilience they deliver, not by sanctioned expenditure alone. Subsidised power, crop procurement, treatment-plant contracts and urban expansion can each influence the water balance. Costs should be evaluated over asset life, including energy, operation, maintenance, sludge management and replacement.

The Atlas should link capital spending to measurable outcomes such as reliable supply, reduction in groundwater stress, functioning treatment and recovered storage. Where contracts combine construction with long-term operation, compare them on a consistent cost basis rather than presenting total contract value as pure capital expenditure.

Decision test: which investments deliver the largest verified improvement in water security per rupee, and who bears the cost? Outcome indicators: lifecycle cost, service delivered, avoided depletion, treatment compliance and equitable access.

Water Stewardship · proposed analytical framework

Explore evidence requirements for dependable services, verified recharge, actual wastewater treatment and reuse, equity safeguards, and independently audited claims. These are evidence needs and policy options; the chapter does not create a score or assert that the measures are currently populated.

Read the Water Stewardship chapter and eight-dimension crosswalk →
India Water Systems · Editorial master narrative

Governance, evidence and accountability

Read the analysis

Water systems cross the boundaries of departments, districts and political terms. Rainfall monitoring, groundwater regulation, agriculture, irrigation, municipal supply, wastewater and river ecology are often managed through separate datasets and programmes. Fragmentation makes it easy to count activities while missing cumulative outcomes.

The Atlas should identify who measures, who decides, who operates, who pays and who is accountable for each indicator. Every figure needs its source, geographic boundary, reporting date, definition and quality status. Conflicting authoritative figures should remain visible rather than being silently reconciled.

Decision test: when an indicator deteriorates, which agency can act and what evidence would demonstrate improvement? Outcome indicators: coverage of validated measurements, public reporting frequency, service outcomes, corrective-action closure and independent verification.

Water Stewardship evidence and accountability chapter → · Eight Water Security assessment dimensions →

Where is groundwater extraction highest relative to the assessed resource?

Punjab, Rajasthan and Haryana were the only three of the 12 states shown here above 100% in the 2025 assessment. Uttar Pradesh had the highest estimated extraction of the states shown, at 46.89 billion cubic metres per year, and its published stage was 70.00%.

The published extraction stage divides estimated annual groundwater extraction by the assessed annual extractable resource. Above 100% means estimated extraction exceeds that resource. A state estimate below 100% can include areas under higher pressure. Check local assessments and well records before drawing conclusions about district pumping or supply reliability. Central Ground Water Board, 2025 assessment, Annexure I.

Compare the 12 state estimates
2025 state assessment estimates. Volumes in billion cubic metres per year.
StateExtraction stageAnnual extractionAnnual extractable resource
Punjab156.36%26.2716.80
Rajasthan147.11%17.1011.62
Haryana136.75%12.729.30
Tamil Nadu73.50%15.0420.46
Uttar Pradesh70.00%46.8966.97
Karnataka66.49%11.5817.41
Gujarat55.95%14.3325.61
Maharashtra51.79%16.5731.99
Odisha48.75%7.8116.02
Bihar46.20%14.4731.32
West Bengal45.19%10.6223.50
Assam waterbody map14.45%2.9320.29

Assam’s linked map shows mapped waterbodies. Its figures here are the statewide groundwater estimates from the same assessment.

Explore the state comparisons for North, South, East and West.

Three worked examples

Open a question to see what the evidence supports and what to check next.

1. Where should groundwater pressure be checked first?

1. Where should groundwater pressure be checked first?

Finding. Estimated annual extraction exceeded assessed annual extractable groundwater in all three states in 2025. Irrigation was the largest reported extraction category in each. The state figures identify a reason to investigate pumping and water levels locally.

CGWB 2025 state estimates. Volumes in billion cubic metres per year.
State stage mapExtractable resourceTotal extractionIrrigation extractionStage
Punjab16.8026.2724.89156.36%
Haryana9.3012.7211.42136.75%
Rajasthan11.6217.1014.46147.11%

What drives the follow-up. In Punjab, irrigation accounts for 24.89 of 26.27 BCM of estimated annual extraction (94.7%). Together with the 156.36% stage, this supports checking irrigation pumping and canal deliveries first in selected assessment units. It does not quantify savings from any particular change in crops or canal operations. CGWB 2025, Annexure I.

Read the map. Compare only districts with a reported stage. Punjab’s map leaves three unmatched district names unclassified. A state stage applies to the state total.

Check change over time. The comparable national series moved from 60.47% in 2024 to 60.63% in 2025. This is a national comparison. The table above provides a single statewide snapshot for each of these three states.

Next decision. Use the district evidence to select places for follow-up and ask CGWB and the state groundwater department for comparable assessment-unit boundaries, pumping records and observation-well trends. Household supply reliability needs service records.

CGWB 2025 compilation, Table 1.1 and Annexure I · National trend and methodology

2. What can a partial district water account tell us?

2. What can a partial district water account tell us?

Finding. In Bengaluru Rural’s 2024 assessment, estimated annual extraction exceeds estimated annual recharge. Thanjavur and Varanasi have paired 2025 estimates. Tiruvarur has a linked district polygon and lacks the paired estimates in this view.

Selected district estimates from retained CGWB assessments. Use the year and unit on each row.
DistrictYearAnnual rechargeAnnual extractionUnit
Thanjavur2025115,977.07105,452.67ha-m/year
Tiruvarur2025UnavailableUnavailableha-m/year
Bengaluru Rural20240.17502650.2316446BCM/year
Varanasi20250.52818880.4242639BCM/year

Interpretation. Compare recharge and extraction within each district and assessment year. Official extraction stage uses annual extractable resource, a different denominator. The rows span different assessment years and units and cannot support a district ranking.

Same-year contrast in Karnataka. In 2024, Bengaluru Rural’s estimated extraction (0.23164 BCM/year) exceeded its estimated recharge (0.17503). Mysuru’s estimated extraction (0.31960) was below its estimated recharge (0.68840). The rounded values show why the districts warrant different follow-up. Check pumping and well levels first where the assessment pair flags pressure. A recharge comparison gives neither official extraction stage nor the adequacy of delivered supply. CGWB 2024 source · Mysuru district.

Missing components. Comparable delivered supply, demand, measured returns and verified reuse are unavailable for these district-and-period pairs.

Next decision. Ask the district water agencies and relevant utilities for records covering the same boundary and period before estimating a balance. Check the source rows for Tiruvarur before drawing any conclusion about its groundwater pressure.

CGWB 2024 compilation · CGWB 2025 compilation

3. When does a missing link change the decision?

3. When does a missing link change the decision?

Finding. Rengali provides a dated storage series with a geographic conflict. Maharashtra provides wastewater capacity and reporting figures with no verified delivered-reuse measure. Each can inform a different next check.

Two separate records with different geographic and measurement scopes.
EvidenceSource findingDecision and missing record
Rengali, Odisha364 manual daily observations in 2010. The retained values range from 11 to 2,164 million cubic metres. Station district ANUGUL (LGD 344) differs from the same-name polygon in Deogarh (OD-351).Use the series as station evidence. Ask CWC and the map custodian to confirm the station-to-reservoir ID and capacity basis before mapping the series or reporting storage as a percentage.
Maharashtra wastewater31 August 2025 detailed table: 423 ULBs, 9,196 MLD sewage generation and 6,072.4 MLD installed capacity. The report labels 4,846.4 MLD as treatment in the headline and as operational capacity in the detailed table.Ask the operator for metered treatment, compliant discharge and verified reuse delivered by end use before judging performance or estimated freshwater savings.

Atlas Rengali chart and linkage caveat · CWC/NWIC storage source · Atlas Maharashtra chart and detailed table · MPCB source schedule

How long was storage low in the retained series? From 16 June to 26 July 2010, all 41 consecutive daily Rengali readings were below 100 million cubic metres. The lowest was 11 million cubic metres on 28 June. The 100 million cubic metre threshold is an illustrative cutoff used to read this series. It does not represent an operating limit, a share of capacity or a service failure. The sustained period shows why operating records and the timing of releases matter more than a single reading when investigating reliability. Read the daily chart and source link.

What the reported capacity could cover. In the 31 August 2025 detailed table for 423 urban local bodies, 9,196 MLD of reported generation minus 6,072.4 MLD of installed capacity leaves 3,123.6 MLD, or 34% of reported generation. At full rated operation, the listed capacity could cover at most about 66% of reported generation in aggregate. The comparison identifies a capacity constraint. It does not measure untreated discharge or reuse. Check local capacity and metered flow before deciding where to expand or improve operations. MPCB detailed ULB table, 31 August 2025.

State atlases

Route presence does not mean complete state data coverage.

State evidence coverage

State evidence readiness (selected Batch 4–10 payloads)

Counts use the source collection/state label recorded in these manifests, matched exactly to the state route name. This is not a full Atlas inventory. A zero means no exact label in these selected batches, not no data elsewhere. Batch 10 added 40 source-attribute payloads but no map features; raw XML tags are not verified measurements.

State routeSource payloadsIntegrated evidenceSource themesNew map featuresVerified analyticsGaps / next action
Readiness and evidence limits

Evidence readiness

Evidence means source-linked payloads or extracts. Verified analytics require compatible QA-checked observations and comparable time and geography.

ThemeEvidenceVerified analyticsNew map features B4–B10
Browse the source catalogue

Source payload catalogue

Open the detailed source-payload catalogue and its filters

Different payloads are not deduplicated. Batches 6–10 include source summaries and raw-attribute views; these are not equivalent to row-wise copies of all underlying source observations. The separate download group contains 49 unique payloads; 2 are attribute-only and the other 47 remain withheld.

Open Batch 7 source summaries and QA holds → · Open Batch 8 XML evidence and source years → · Open Batch 9 raw XML attributes → · Open Batch 10 raw XML attributes → · Open verified recovered rainfall/discharge source rows →

Review source-reported basin labels

Exact source-reported basin labels

Per-file inventory only; not a basin boundary layer, classification or cross-source aggregation.

Loading…
Rainfall indicators and charts

National indicator view · rainfall reporting

Scope. On 20 October 2026, 683 of 715 valid source rows (95.52%) reported negative daily departure. The chart tracks how that share changed during the retained reporting period. It does not measure the share of India affected by rainfall deficiency. Each row receives equal weight; it is not a rainfall-volume, land-area or population-weighted national estimate. District/source labels are not joined to Atlas boundaries. The source Daily Actual/Normal unit is undocumented and those values are not used.

Source rows with negative daily departure

Loading source-backed series…

Latest-date regional comparisonSource rowsValid departuresNegative departuresNegative row shareIncluded exact state labels
Atlas state routeSource rowsLatest-date negative shareSource label usedOpen state map

Original national IMD CSV · NWDP resource metadata

Five priority national indicators and evidence readiness

Rainfall source-row departure and the CGWB national groundwater resource/extraction series are implemented. Three other priority themes remain pending for the source-specific reasons recorded below.

IndicatorStatusExact source and periodUnitGeographyCalculation / missing evidence
India Water Systems · Editorial master narrative

Water resources, availability and balance

Read the analysis

Rainfall is an input, not a water-supply guarantee. Its distribution across seasons, catchments and years determines runoff and recharge; storage, conveyance, groundwater access, water quality and competing demands determine how much can actually be used. Surface water and groundwater interact, and the same water can be counted more than once if the accounting boundary is unclear.

The Atlas should present rainfall, runoff, recharge, surface-water storage, groundwater availability, transfers, sectoral withdrawals and return flows in distinct tables before attempting a balance. The national CGWB 2025 assessment reports 448.52 BCM annual groundwater recharge, 407.75 BCM annual extractable groundwater resources, and 247.22 BCM annual groundwater extraction, corresponding to a published extraction stage of 60.63%. These are groundwater-accounting measures; none represents total dependable national water supply. A national demand-versus-supply deficit must not be calculated from these numbers alone.

Atlas interpretation: national totals can conceal a highly uneven geography and seasonal mismatch. Decision test: for each administrative unit or verified basin, what volume is dependable in the critical month or season, after quality, ecological and infrastructure constraints? Required evidence: period-specific availability and demand, boundary definitions, confidence, and provenance.

Editorial source: 01 India Water Systems master narrative

India Water Systems · Editorial master narrative

Reliability, climate variability and future water security

Read the analysis
Numerical claim review: The narrative cites the NCIWRD 1999 high-demand projections of 843 BCM (2025) and 1,180 BCM (2050). The supplied evidence register has no source URL and no underlying source record is present in this Atlas copy. These figures are retained as historical editorial claims, explicitly flagged for source verification; they are not plotted or treated as observed demand.

Annual resource totals are insufficient for planning. A place may experience floods in one season and shortages in another; a nominal surplus can be unusable because of quality, location or delivery constraints. Climate variability increases the importance of stress-testing water systems rather than assuming that historical averages will persist.

The Atlas Water Security Outlook should present baseline, demand-pressure and resilience-response scenarios, not a single deterministic forecast. Scenarios should vary population, agricultural demand, industry, rainfall distribution, infrastructure losses, reuse and groundwater conditions while preserving explicit assumptions. Historical national demand projections, including the NCIWRD 1999 high-demand scenario figures of 843 BCM for 2025 and 1,180 BCM for 2050, must be labelled historical projections—not observed 2025 demand or an updated forecast.

Decision test: can each system meet essential demand during the driest plausible season without unacceptable aquifer decline or ecosystem damage? Outcome indicators: dependable seasonal supply, months of shortfall, quality-adjusted usable water, population exposed and recovery time after shocks.

Groundwater assessment and comparisons

National groundwater resources and extraction · assessment year 2025

Comparable indicator. Stage of Ground Water Extraction is the report-defined ratio of total current annual extraction for irrigation, industrial and domestic use to annual extractable groundwater resource. This assessment is coordinated by CGWB and State/UT departments. The displayed historical comparison uses GEC 2015-method assessments from 2017 onward; intervals are irregular through 2020 and annual from 2022. Stage values are retained as published; earlier values are rounded and are not recomputed from rounded components. This is a resource assessment, not a groundwater-level depth series.

National stage of groundwater extraction

Loading verified assessment tables…

Assessment yearAnnual recharge (bcm)Annual extractable resource (bcm)Annual extraction (bcm)Stage as reportedMethodology

2025 assessment-unit categories

Source-reported categories for 6,762 blocks/taluks/mandals/assessment units; the report defines the categories by stage and saline conditions. Counts are not mapped to Atlas boundaries.

CategoryAssessment unitsShare of total (%)Annual extractable resource (bcm)

2025 state comparison

Select an Atlas administrative browsing group or route. State values are listed individually; regional averages, basin assignments, and spatial joins are not calculated.

Read supply, use and returns together
  • Estimated resource and extraction. The state groundwater comparison uses the CGWB 2025 assessment and reports annual recharge, extractable resource and extraction in bcm.
  • Observed surface water. Maharashtra gauge readings give dated station discharge in cubic metres per second. A single reading cannot establish a period total or available withdrawal volume.
  • Demand and delivered supply. Rural tap coverage describes connection counts. Comparable demand and delivered volumes are unavailable here.
  • Returns and reuse. Maharashtra wastewater evidence gives facility capacity and reported operating status. Comparable measured return flows and verified reuse volumes are unavailable.
  • Transfers. Polavaram evidence separates design volumes, dated project status and proposed links. A measured transfer series is unavailable here.

State comparison bars show CGWB annual estimates in bcm. The national trend above keeps its national scope. District water balance requires compatible withdrawals, surface supply, transfers, storage and returns.

Atlas state routeAnnual recharge (bcm)Extractable resource (bcm)Extraction (bcm)Stage (%)Open map

Preserved original CGWB report PDF · Extracted state/UT source table · Historical source table · CGWB publication record

India Water Systems · Editorial master narrative

Groundwater: the distributed reserve

Read the analysis

Groundwater supports irrigation and domestic supply precisely because it can be accessed locally when surface delivery is unreliable. That flexibility also makes cumulative extraction difficult to govern. Assessment units classified as over-exploited identify pressure on groundwater resources, but classification alone does not reveal the condition of every aquifer, well or household.

The CGWB 2025 compilation classifies 730 of 6,762 assessment units as over-exploited. The Atlas must distinguish recharge, extractable resource, extraction, stage of extraction, groundwater levels and groundwater quality. Assessment-round comparisons should disclose methodology changes. Where well observations exist, display their dates and station coverage; never label assessment estimates as direct well measurements.

Decision test: which places show persistent extraction pressure, declining levels or deteriorating quality, and what surface-water, agricultural and demand-side measures could reduce it? Outcome indicators: extraction stage, observation-well trends, quality exceedances, and seasonal drinking-water reliability.

India Water Systems · Editorial master narrative

Agriculture, food security and irrigation

Read the analysis

Agriculture converts water into food, incomes and rural livelihoods. The question is not whether irrigation should expand in isolation, but whether additional crop output can be supported without making local water systems less dependable. Crop choice, irrigation method, electricity incentives, market demand and canal reliability jointly shape withdrawals.

An increase in irrigated area does not by itself demonstrate better water productivity. The Atlas should compare net and gross irrigated area, source mix, crop area, estimated consumptive use, canal delivery and groundwater extraction using matched years and geographies. Irrigation-efficiency gains can be offset if farmers expand irrigated acreage or shift to more water-intensive crops; therefore both water used per unit of output and total basin-level depletion matter.

Decision test: which agricultural transitions maintain production and livelihoods while reducing water stress? Outcome indicators: crop-specific water productivity, source dependence, total consumptive use and groundwater trends. Undocumented irrigation XML units remain evidence only, not quantitative inputs.

Odisha reservoir storage observations

Odisha — Rengali manual reservoir storage, 2010

Rengali recorded 41 consecutive daily readings below an illustrative 100 million cubic metre cutoff, from 16 June to 26 July 2010. See the calculation, interpretation and limits.

One-station historical series, not a national storage indicator. The CWC/NWIC source reports absolute manual daily storage in mcm. A live-storage capacity denominator is unavailable. The source row identifies ANUGUL (LGD 344), while the same-name reservoir polygon in the local layer identifies Deogarh (LGD OD-351); no geometry or district join is made. The source basin label also conflicts with its Brahmani river field, so no basin classification is shown.

Loading preserved CWC observations…

CWC/NWIC resource metadata

India Water Systems · Editorial master narrative

Rivers, reservoirs, floodplains and restoration

Read the analysis

A reservoir changes not only the volume of water stored but often the timing of downstream flows. Embankments may reduce direct river inundation while leaving local rainfall trapped behind them. River restoration therefore cannot be assessed solely by channel appearance or the number of works completed: it must consider environmental flows, sediment, floodplain connectivity, tributaries, wetlands, groundwater exchange and community livelihoods.

The Atlas retains a 364-observation Rengali manual-storage series for 2010, reported in the source field's MCM units. It is a station time series, not a national storage fraction. The CWC reservoir GeoJSON is withheld from map integration because its CRS is undeclared and geographic validity cannot yet be established. Valid geometry after repair is not proof of correct location.

Decision test: do interventions improve downstream reliability, ecological condition and flood risk as well as upstream storage? Outcome indicators: seasonal flow, storage relative to verified capacity, environmental-flow compliance, flood exposure, wetland condition and restored connectivity.

South regional case study: Polavaram and proposed basin links →

Maharashtra wastewater evidence

Maharashtra wastewater evidence · MPCB snapshot 31 August 2025

Reported generation exceeded installed capacity by 3,123.6 MLD in the August 2025 detailed table. See the calculation, interpretation and limits.

State-specific source evidence; not a national indicator. MPCB reports 9,190.10 MLD sewage generation, 6,072.3 MLD treatment capacity and 4,846.4 MLD “sewage treatment” in its headline. Its detailed table covers 423 ULBs and totals 9,196 MLD generation, 6,072.4 MLD installed capacity and 4,846.4 MLD operational capacity. The detailed-table operational-capacity label and headline treatment label refer to the same value; the report does not document a metered-flow method. Both versions are retained without reconciliation. The source-reported 52.70% is displayed without recalculation.

Source table by ULB class

Loading preserved MPCB table…

ULB class (source)ULBsSewage generation (MLD)Installed capacity (MLD)Operational capacity (MLD)Gap in treatment (MLD)Source-reported treatment (%)

ULB-class source table · MPCB report PDF · MPCB publication page

Circular wastewater · facilities, treatment and reuse

Circular wastewater pathway · Maharashtra evidence demonstration

Compare facility design and reported values

Each row compares two cells from one source record. Periods and second-column definitions differ across sources. The examples support facility-level interpretation. Measured return flows and verified reuse are unavailable in these records.

Selected published facility records, in MLD
FacilitySource and periodInstalled or designSecond source cellVerified reuse
Maharashtra · Colaba WWTFMPCB · 31 Aug 20254131 · Present capacityUnavailable
Tamil Nadu · Koyambedu STP Zone – IIINMCG · June 20243430.87 · Reported utilizationUnavailable
Karnataka · Jamkhandi, Near Malgur roadLegislative Council · 13 Feb 20247.62 · Reported utilizationUnavailable
Uttar Pradesh · Ayodhya 12MLD UASBJJM / Namami Gange · updated 2026-06-161212 · Reported flowUnavailable

Polavaram transfer evidence and design limits

The retained MPCB snapshot supports a state and ULB-class view of sewage generation and treatment infrastructure. It does not establish metered treatment flows, compliant effluent, or water reused.

Evidence by wastewater pathway stage

This is an evidence-availability view for the Maharashtra MPCB snapshot dated 31 August 2025. It keeps reported values, ambiguous measures and missing observations separate; it is not a complete water balance or circularity score.

Pathway stageEvidence availableUnit / scopeInterpretation and gap
1 · Sewage generated9,190.10 headline; 9,196 detailed tableMLD · Maharashtra · 423 ULBs in detailed tableTwo source totals differ and are retained separately; detailed values are source-reported.
2 · Collected and conveyedNot reported in this captured tableNo comparable quantityCollection coverage, conveyance losses and bypass flow remain unmeasured here.
3 · Installed treatment capacity6,072.3 headline; 6,072.4 detailed tableMLD · MaharashtraCapacity is infrastructure provision, not actual throughput.
4 · Operational treatment / treated flow4,846.4MLD · MaharashtraThe headline calls this “sewage treatment”; the detailed table calls it “operational capacity”. No metered-flow method is documented, so actual treated flow is not verified.
5 · Compliant dischargeNot reported in this datasetNo effluent-compliance seriesDo not infer treatment quality or safe discharge from capacity or status labels.
6 · Beneficial reuseNot reported in this datasetNo delivered reuse volume or end-use splitFreshwater displacement by reuse cannot be calculated.
7 · Resource recovery and accountabilityNot reported in this datasetNo sludge, energy, cost or operator fields in captured evidenceRecovery performance, operating cost and accountable operator cannot be assessed from this source.

Evidence source: MPCB publication page · MPCB snapshot PDF. Values above preserve the source’s reported date, geography and MLD units; no missing stage has been estimated.

Facility schedule as published

Open the published 171-row Maharashtra facility schedule and filters

Loading source-cell rows…

Published facility-level figures · source cells in MLD

Each bar pair shows the source table’s individual “installed” and “present” cells, without summing facilities or calculating treatment ratios. “Present” is not verified as metered treated flow. The chart shares an 800 MLD scale; source rows with missing/non-numeric “present” cells remain in the schedule and are reported here.

Loading source rows…

Source table orderULB / townLocationInstalled capacity (MLD)Status (source)Present capacity / utilisation (MLD)PDF page

Source schedule contains 171 facility rows; table serials are clipped in part of the PDF, so this display uses source-table order and preserves printed serial text in the data. Two present-capacity cells are missing/non-numeric. Summing facility cells does not reconcile to printed totals; facility totals and derived percentages are therefore withheld. “Present capacity/utilisation” is not independently verified metered flow. No coordinates or district joins are assigned. Contact details were removed from this public derivative. Source: MPCB publication page · MPCB source PDF .

Atlas scope: Maharashtra only; no comparable national, regional, or other-state wastewater denominator is presently established. This is an evidence pathway, not a circularity/reuse performance score.

India Water Systems · Editorial master narrative

Wastewater, treatment and reuse

Read the analysis

Wastewater is simultaneously a public-health risk, an environmental pressure and a potential water resource. Installed treatment capacity is not equivalent to wastewater collected, plant throughput, compliant treatment or actual reuse. A city can report ample installed capacity while sewage bypasses the network or plants operate below design capacity.

The Maharashtra MPCB snapshot retained in Build 35 contains conflicting headline and tabular totals. The figure 4,846.4 MLD is described in different places as treatment and operational capacity; the preserved source does not establish metered actual treatment flow. The Atlas must show generation → collection → conveyance → operational treatment → compliant discharge → beneficial reuse as separate indicators, with dates and denominators.

Decision test: how much freshwater demand is actually displaced by verified reuse? Outcome indicators: metered influent and effluent, compliance, reuse delivered to end users, bypass volume and energy/operating performance.

Not yet established

National water balance

No complete compatible balance of supply, use, transfers, storage and return flows is established by these payloads.

Demand and service levels

National urban/rural demand, LPCD, continuity and sector demand need verified denominators and comparable observations.

Hydrological joins

No basin boundaries or verified state-to-basin, asset-to-basin, transfer or command-area joins were added.